Figure 1-1: CENTAL SUBWAY Study Area Location 1-3
Figure 1-2: Study Area Population and Employment 1-7
Figure 1-3: Central Subway and Third Street Corridor Projected 2030 Level Of Service (LOS) At Various Locations 1-10
Figure 2-1: central subway build Alternatives 2-2
FIGURE 2-2: alternative 1 – no project/tsm 2-4
FIGURE 2-3: no project/TSM ALTERNATIVEs TRANSIT AND ROADWAY IMPROVEMENTS 2-7
FIGURE 2-4: alternative 2 – enhanced eis/eir alignment 2-10
FIGURE 2-5: ENHANCed EIS/EIR Alignment Profile between fourth/King and market/third STREETs 2-11
FIGURE 2-6: ENHANCed EIS/EIR Alignment Profile between market/ third STREET and stockton/jackson streets 2-12
FIGURE 2-7: ENHANCed EIS/EIR Alignment - Moscone station 2-15
FIGURE 2-8: ENHANCed EIS/EIR Alignment – MARKET STREET station 2-16
FIGURE 2-9: ENHANCed EIS/EIR Alignment - union square station 2-18
FIGURE 2-10: ENHANCed EIS/EIR Alignment - chinatown station 2-20
FIGURE 2-11: ALTERNATIVE 3 -Fourth Stockton Alignment OPTION A (lpa) 2-25
FIGURE 2-12: fourth/stockton Alignment option a PROFILE between fourth/King and STOCKTON/JACKSON STREETs 2-27
FIGURE 2-13: fourth/stockton Alignment option a - Moscone station 2-29
FIGURE 2-14: fourth/stockton Alignment option a union square/ Market street station 2-30
FIGURE 2-15: FOURTH/stockton ALIGNMENT OPTION A - chinatown station 2-32
FIGURE 2-16: ALTERNATIVE 3 –Fourth/Stockton Alignment Option B (Modified LPA) 2-37
fIGURE 2-17: FOURTH/stockton ALIGNMENT OPTION b profile 2-38
FIGURE 2-18: FOURTH/stockton ALIGNMENT OPTION b CONFIGURATION ON FOURTH STREET Semi-Exclusive Right-of-Way 2-39
FIGURE 2-19: FOURTH/stockton ALIGNMENT OPTION b CONFIGURATION ON FOURTH STREET mixed Right-of-Way 2-41
FIGURE 2-20: FOURTH/stockton ALIGNMENT OPTION B - Moscone station 2-43
FIGURE 2-21: FOURTH/stockton ALIGNMENT OPTION B - union square/ market street station 2-44
FIGURE 2-22: FOURTH/stockton ALIGNMENT OPTION B - chinatown station 2-46
FIGURE 2-29: Third street light rail Phase 1 initial operating segment and phase 2 central subway 2-53
FIGURE 3-1: EXISTING MUNI ROUTES serving the study area 3-6
Figure 3-2: Proposed Mission Bay Route Changes 3-11
FIGURE 3-3: ORIGIN - DESTINATION DISTRICTS 3-12
FIGURE 3-4: BICYCLE ROUTES AND BAY TRAIL IN THE THIRD STREET CORRIDOR 3-29
FIGURE 4-1: AREA PLAN BOUNDARIES 4-4
FIGURE 4-2: REDEVELOPMENT PLAN BOUNDARIES 4-8
FIGURE 4-3: generalized LAND USE 4-21
FIGURE 4-4: PUBLIC FACILITIES ALONG CENTRAL SUBWAY CORRIDOR 4-36
figure 4-5: historic districts 4-54
FIGURE 4-6: FOURTH STREET LOOKING TO I-80 (TUNNEL & STAGING AREA) 4-79
FIGURE 4-7: union square looking west 4-80
FIGURE 4-8: UNION SQUARE FROM MAIDEN LANE 4-80
FIGURE 4-9: CHINATOWN, STOCKTON STREET AT SACRAMENTO, 814-828 stockton street location 4-82
FIGURE 4-10: Willie “Woo Woo” Wong Park Playground View 4-82
Figure 4-11: Washington Square Park 4-83
Figure 4-12: General Vicinity Map of Study Area 4-108
Figure 4-13: Detailed Ground-Borne Vibration Criteria 4-131
Figure 4-14: Noise and Vibration Measurement Positions (Enhanced 1998 EIS/EIR Alignments Sites N1 - N6) 4-134
Figure 4-15: Noise and Vibration Measurement Positions Figure 4-15: Noise and Vibration Measurement Positions (Fourth/Stockton Alignment - Sites 1 - 3, and Sites A - F) 4-135
FIGURE 5-1: Tunnel ALTERNATIVE AT third/bryant - Visual simulation Alternative 2 5-28
FIGURE 5-2: MOSCONE GARAGE - simulation of station entry ALTERNATIVE 2 5-29
FIGURE 5-3: market street station entry simulation ALTERNATIVE 2 5-30
FIGURE 5-4: union square station entry simulation ALTERNATIVEs 2 and 3a 5-31
FIGURE 5-5: chinatown station entry simulation ALTERNATIVEs 2 and 3a 5-32
FIGURE 5-6: CHINATOWN STATION simulation viewed from pagoda alley ALTERNATIVEs 2 and 3a 5-33
FIGURE 5-7: shadows on Willy “Woo Woo” wong playground ALTERNATIVEs 2 and 3a 5-35
FIGURE 5-8: FOURTH STREET portal simulation ALTERNATIVE 3A 5-36
FIGURE 5-9: moscone station entrance simulation ALTERNATIVEs 3a and 3b 5-38
FIGURE 5-10: FOURTH STREET PORTAL simulation ALTERNATIVE 3B 5-40
FIGURE 5-11: Union square station Geary Street entry simulation ALTERNATIVE 3B 5-41
Figure 5-12: CHINATOWN STATION stockton street entry simulation Alternative 3B 5-42
Figure 5-13 CHINATOWN STATION simulation looking east from WASHINGTON STREET Alternative 3B 5-43
Figure 6-1: earth pressure balance tunnel boring machine 6-3
Figure 6-2: Cut-and-cover Tunnel Construction 6-4
Figure 6-3: Tunnel Construction using Sequential Excavation Method (SEM) 6-6
Figure 6-4: Special Excavation Method (SXM) Concept Developed for the 1998 FEIS/FEIR 6-7
Figure 6-5: Construction Durations for Alternatives 2, 3A and 3B 6-10
Figure 6-6: alt. 2 Area of Surface Disturbance During Construction 6-12
Figure 6-7: Alt. 2 Market Street Station Area of Surface Disturbance During Construction 6-13
Figure 6-8: Alt. 2 Union Square Station Area of Surface Disturbance During Construction 6-14
Figure 6-9: Alt. 2 Chinatown Station Area of Surface Disturbance During Construction 6-15
Figure 6-10: Construction Activities and Durations for union square and union square/market street Stations 6-19
Figure 6-11: Alt. 3A Moscone Station Area of Surface Disturbance During Construction 6-21
Figure 6-12: Alt. 3A Union Square/Market Street Station Area of Surface Disturbance During Construction 6-22
Figure 6-13: Alt. 3A Chinatown Station Area of Surface Disturbance During Construction 6-24
Figure 6-14: Alt. 3B Moscone Station Area of Surface Disturbance During Construction 6-28
Figure 6-15: Alt. 3B Union Square/Market Street Station Area of Surface Disturbance During Construction 6-30
Figure 6-16: Alt. 3B Chinatown Station Area of Surface Disturbance During Construction 6-31
Figure 6-17: 814-828 Stockton Street proposed for demolition under Alternatives 2 and 3A 6-72
Figure 6-18: 933-949 Stockton Street proposed for demolition under Alternative 3B 6-79
Figure 10-1: Section 4(f) Properties 10-10
Figure 10-2: ALTERNATIVES 2, 3a, AND 3b 10-14
Figure 10-3: Union Square looking west from Maiden Lane 10-19
Figure 10-4: Union Square Park Schematic Plan 10-20
Figure 10-5: Union Square seating area for outdoor café, looking north 10-20
Figure 10-6: Willie “Woo Woo” Wong Playground looking north 10-23
Figure 10-7: Plaque on the wall of Pagoda/Hang Ah Alley 10-23
Figure 10-8: Willie “Woo Woo” Wong Playground Schematic Plan 10-24
Figure 10-9: Washington Square Park Schematic Plan 10-25
Figure 10-10: plan drawing of union square station for proposed alternative 2 10-30
Figure 10-11: Plan Drawing of Union Square Station for Proposed Alternative 3 Option A 10-33
Figure 10-12: Union Square looking east, potential site of future station 10-35
Figure 10-13: Plan Drawing of Union Square Station for Proposed Alternative 3 Option B 10-36
Figure 10-14: Plan Drawing of Chinatown Station for Proposed Alternative 2 10-38
Figure 10-15: shadow analysis willie “woo woo” wong playground 10-39
Figure 10-16: Washington Square looking northeast across Columbus Avenue 10-42
VOLUME II
CHAPTERS
1.0 INTRODUCTION 1-1
2.0 LIST OF PERSONS COMMENTING 2-1
3.0 WRITTEN COMMENTS AND RESPONSES 3-1
4.0 PUBLIC HEARING COMMENTS AND RESPONSES 4-1
5.0 STAFF INITIATED TEXT CHANGES 5-1
LIST OF TABLES VOLUME II
Revised Table 4-7 3-159
Revised Table S-5 5-6
Revised Table S-6 5-7
Revised Table S-8 5-8
Revised Table 2-1 5-11
Revised Table 2-5 5-13
Revised Table 3-8 5-18
Revised Table 3-9 5-19
Revised Table 3-10 5-19
Revised Table 3-11 5-20
Revised Table 3-13 5-20
Revised Table 3-14 5-21
Revised Table 6-2 5-23
Revised Table 9-4 5-26
LIST OF FIGURES VOLUME II
Revised Figure 2-16 3-56
Revised Figure 2-18 3-59
Revised Figure 2-19 3-60
Revised Figure 5-10 3-61
Revised Figure 4-4 3-161
Revised Figure 2-29 5-15
Revised Figure 3-3 5-17