New Overhead Wiring – Reroute 33 Stanyan on to Valencia Street

Construct new overhead wire to allow the 33 Stanyan to be rerouted on to Valencia Street between 16th and 18th Streets.  This would reduce friction with Mission Street buses to improve the reliability of Mission Street transit services and would improve connections to the 22 Fillmore at the 16th Street BART Station.

Bypass Wires at Various Terminal Locations

Install bypass wires to improve terminal operations where multiple trolley routes share a terminal.  This would allow buses to pass each other.  These could be located at:  Fourth and Townsend Streets, Lyon and Union Streets, and Presidio and Sacramento Streets.

New Overhead Wiring –
6 Parnassus on Stanyan Street

New overhead wires from Haight Street to Parnassus Avenue (0.3 mile) that would allow the 6 Parnassus to operate on the full length of Haight Street.  This would increase service on the busiest portion of Haight Street west of Masonic Avenue.  

5 Fulton Limited/Local Bypass Wires

Install bypass wires at strategic locations between Sixth Avenue/Fulton Street and Market Street/McAllister streets, to allow for introduction of a 5L Fulton Limited trolley coach service alongside the 5 Fulton (local) trolley coach service, allowing both services to run concurrently on Fulton Street with electric trolley vehicles. 

22 Fillmore Extension to Mission Bay

New overhead wire on 16th Street between Connecticut Street and Third Street and parts of the UCSF Campus that would provide connections to Mission Bay, including the new UCSF campus and hospital, residential projects, and research facilities.  The 33 Stanyan would be re-routed from Potrero Avenue to cover 22 Fillmore service on 18th Street.

New Overhead Wiring – 6 Parnassus Extension to West Portal Station

This project would provide a direct connection for customers on the west side of Twin Peaks and existing customers in the western portions of the Haight and Cole Valley to Muni Metro service at West Portal Station.

Accessible Rail Platforms

Build accessible platforms to expand the number of accessible stops along the surface portions of the light rail system.  This would allow people with mobility impairments to better utilize the light rail system.

Sansome Street Contraflow Extension

Extend southbound “transit-commercial” contraflow lane north three blocks on Sansome Street to Broadway using paint, signage, and signal modifications from Broadway to Clay Street.  This project is related to the 10 Townsend service change.

Van Ness Avenue and North Point Street Hub and Terminal

Build enhanced terminal facilities to accommodate proposed route changes, including the 11 Downtown Connector, 28L 19th Avenue Limited, 30 Stockton, 47 Van Ness and 49L Van Ness-Mission Limited. Components include street geometry changes to accommodate transit vehicle movements and to provide adequate on-street layover space.

Daly City BART Bus Layover Improvements

Expand and reconfigure SFMTA stop and bus layover facilities at the Daly City BART Station to accommodate Muni bus layovers.

Lee Street Terminal for 52 Excelsior

Create on-street terminal space on newly-planned Lee Street near Phelan Avenue, which is needed to accommodate extending the 52 Excelsior to the City College area to improve customer transfers to BART, and provide additional access to City College.

E Line Independent Terminal at Jones Street/Beach Street

Create one block of new track and overhead, switches and boarding island to facilitate independent movement of E and F lines at northern terminus.  

Lyon Street/Richardson Avenue Bus Stop – Transfer Point

Improve transfer point at Lyon Street and Richardson Avenue for the SFMTA’s 28L 19th Avenue Limited and Golden Gate Transit (GGT) services.  This project would replace the transfer currently at the Golden Gate Bridge toll plaza, which the 28L 19th Avenue Limited would no longer serve.  28 19th Avenue (local service) customers would continue to transfer at the Golden Gate Bridge.

San Francisco General Hospital Transfer Point

Design and implement new transfer hub between 23rd and 24th streets and Potrero Avenue to make transferring between Routes 9/9L San Bruno/Limited, 10 Townsend, 19 Polk, 48 Quintara-24th Street and 58 24th Street more convenient.  

Accessible Rail Platforms

Build accessible platforms to expand the number of accessible stops along the surface portions of the light rail system.  This would allow people with mobility impairments to better utilize the light rail system.

Sansome Street Contraflow Extension

Extend southbound “transit-commercial” contraflow lane north three blocks on Sansome Street to Broadway using paint, signage, and signal modifications from Broadway to Clay Street.  This project is related to the 10 Townsend service change.

Van Ness Avenue and North Point Street Hub and Terminal

Build enhanced terminal facilities to accommodate proposed route changes, including the 11 Downtown Connector, 28L 19th Avenue Limited, 30 Stockton, 47 Van Ness and 49L Van Ness-Mission Limited. Components include street geometry changes to accommodate transit vehicle movements and to provide adequate on-street layover space.

Daly City BART Bus Layover Improvements

Expand and reconfigure SFMTA stop and bus layover facilities at the Daly City BART Station to accommodate Muni bus layovers.

Lee Street Terminal for 52 Excelsior

Create on-street terminal space on newly-planned Lee Street near Phelan Avenue, which is needed to accommodate extending the 52 Excelsior to the City College area to improve customer transfers to BART, and provide additional access to City College.

E Line Independent Terminal at Jones Street/Beach Street

Create one block of new track and overhead, switches and boarding island to facilitate independent movement of E and F lines at northern terminus.  

Lyon Street/Richardson Avenue Bus Stop – Transfer Point

Improve transfer point at Lyon Street and Richardson Avenue for the SFMTA’s 28L 19th Avenue Limited and Golden Gate Transit (GGT) services.  This project would replace the transfer currently at the Golden Gate Bridge toll plaza, which the 28L 19th Avenue Limited would no longer serve.  28 19th Avenue (local service) customers would continue to transfer at the Golden Gate Bridge.

San Francisco General Hospital Transfer Point

Design and implement new transfer hub between 23rd and 24th streets and Potrero Avenue to make transferring between Routes 9/9L San Bruno/Limited, 10 Townsend, 19 Polk, 48 Quintara-24th Street and 58 24th Street more convenient.  

map of above capital projects
map of above capital projects

Explore:

   
   

Skip bottom navigation and boilerplate text.Begin brief site navigation and boilerplate text.

For Muni route, schedule, fare and accessible services information anytime: Visit www.sfmta.com or call 311.

telephone311: 中文 / Español / Français / 日本語 / 한국어 / Italiano / русский / tiếng Việt / Tagalog / عربي / ภาษาไทย