The Golden Gate Avenue Safety Project is an effort to increase safety for more vulnerable people on Golden Gate Avenue. Golden Gate Avenue is a High Injury Corridor with some of the highest pedestrian...
The Golden Gate Avenue Safety Project is an effort to increase safety for more vulnerable people on Golden Gate Avenue. Golden Gate Avenue is a High Injury Corridor with some of the highest pedestrian...
The Twin Peaks Figure 8 Redesign Project was sponsored by San Francisco Recreation and Parks Department (RPD) in partnership with the SFMTA and San Francisco Public Works (SFPW). Please visit the RPD...
Division/13th Street is a key east-west corridor for people biking to destinations like the Caltrain Station, the Mission District, Oracle Park, and the South Beach area in general. Many well-used...
Take the Shared Rides Survey now! English 中文 Español Tiếng Việt русский Tagalog For accessible surveys, please call (415) 701-5669 for assistance. Whether you ride or drive, the survey is intended to...
The SFMTA is proposing to upgrade Bryant Street between Division and 17th Streets in coordination with repaving with new bike facilities and streamlined Muni stops.
The Connected Corridor Project seeks to evaluate the use of transit platform & traffic signal sensors to inform signal timing adjustments and collect information to support safety improvement efforts...
In 2016, the U.S. Department of Transportation challenged mid-population cities to come up with the most effective and equitable way to further the adoption of shared, connected, autonomous vehicles...
PLEASE NOTE: There are presently no permitees under this program – Revel has ceased shared moped operations effective 11/18/23 The Shared Electric Moped Parking Permit Program grants qualified...
The Muni Metro Stations (Embarcadero, Montgomery, Powell, Civic Center, Van Ness, Church, Castro, Forest Hill and West Portal) serves as San Francisco’s highest ridership corridor, welcoming over 87...
The 5th Street Improvement Project improves safety along the corridor for those who walk, bike, and drive in the neighborhood. The 5th Street Project is separated into two phases of work- the 5th...
The SFMTA is evaluating the 66 Quintara route to identify potential service and connection changes to optimize access to neighborhood destinations and transit hubs. The route currently serves a...
The 11th Street Improvement Project proposes to enhance the overall safety of 11th Street from Market Street to Division Street. 11th Street serves as a major connector to and from Civic Center, SoMa...
Project Update The goal of the 20th Avenue Neighborway project is to create a more pleasant north-south route for people walking and biking in the Sunset District to Golden Gate Park, Stern Grove and...
Installation of new traffic safety improvements is underway! Construction is now complete! We appreciate the community's patience during the construction process. We hope you enjoy the new design and...
The On-Street Shared Vehicle Permit Program administers permits for curbside parking spaces for dedicated shared vehicle use. The program was approved in July 2017 after it was tested as a pilot...
In 2013, Mayor Ed Lee convened Transportation Task Force T2030, which brought together community advocates and experts in finance and transportation policy to study the city’s transportation...
33 Stanyan Pole Replacement and Overhead Wire Reconstruction Project – Phase 2 began February, 2017 to reduce the on-going maintenance burden on this trolley coach line. Under the $5.3 Million Project...
The Southeast Muni Expansion includes new Muni bus routes, Muni bus route extensions and reroutes, and more frequent service on existing Muni bus routes in San Francisco’s southeastern neighborhoods –...
The purpose of this project is to upgrade the existing King Substation, located near Oracle Park’s northeast entrance at 2nd Street and King Street, to provide sufficient electrical power for the Muni...
The Alemany Interchange Bike Lanes Project proposes striping changes for more safe biking and walking conditions through the “Alemany Maze” including new buffered bike lanes, flexible delineator posts...
LATEST UPDATE: Thanks to agency partners, community support and Supervisor Yee, the Forest Hill Irrigation Improvement Project was successfully completed in late June. This project aims to conserve...
The project is to construct a new traction power electrical circuit and install new switch equipment along Church Street between Market Street and Duboce Avenue, also known as the Duboce Portal. Once...
The transportation sector's reliance on fossil fuels makes the sector the city’s largest source of greenhouse gas (GHG) emissions and criteria air pollutants. Along with mode shift away from single...