TEP - Transit Effectiveness Project

Project Overview

The COMMUNITY GUIDE TO THE TRANSIT EFFECTIVENESS PROJECT is now available! Please see the EIR Final Documents link below under "Latest Updates" for more details.

SFMTA is embarking on a comprehensive overhaul of San Francisco’s transit network, the Transit Effectiveness Project (TEP). The proposed changes will modernize Muni and make it more efficient, reliable, safe and comfortable for its existing 700,000 daily passengers. Developed over several years of data collection, intensive planning and public outreach efforts, the TEP will restructure transit service on certain lines to improve efficiency and connectivity and implement transit priority changes on the most heavily used lines to give buses and trains more priority on our City streets.

Recently, SFMTA has conducted extensive outreach about its numerous TEP service change proposals and has collected a great deal of feedback about the proposals from members of the public. Several of the service change proposals have been revised based on the input that was received. Please click on the "Details" tab above to learn more about the revised proposals.

We want your input! Provide feedback on the proposed changes by visiting www.tellmuni.com.

Upcoming meetings

No upcoming meetings have been posted

Project Details

Community Guide to the TEP,  the TEP Implementation Plan, & the TEP Outreach Summary are Now Available!

On this page:
- Overview
- Service Proposals on Hold (19, 48 (east of Potrero Avenue), 58, 23, 54, 90/91A/91B Owl)
- Service Proposals Not Being Pursued - based on input received from public and from Policy and Governance Committee (PAG) (27, 32, 36, 37, 56)
Revised Service and Route Changes - based on input received from public and from Policy and Governance Committee (PAG) (2, 3, 6, 8X, 101112, 17, 2228, 28L, 35, 43, 47, 48)
- Originally Proposed Service and Route Changes  (E, F, J, KT, L, M, N, NX, 1, 1AX, 1BX, 2, 3, 5, 5L, 6, 8X, 8AX, 8BX, 9, 9L, 10, 11, 12, 14, 14L, 14X, 16X, 17, 18, 19, 21, 22, 23, 24, 27, 28, 28L, 29, 30, 30X, 31, 31AX, 31BX, 32, 33, 35, 36, 37, 38, 38L, 38AX, 38BX, 39, 41, 43, 44, 45, 47, 48, 49, 49L, 52, 54, 56, 58, 66, 67, 71L, 76, 80X, 81X, 82X, 88, 90, 91A, 91B/N Owl, 108, Cable Car)
- Ridership / Boarding Data
- Project Details
- Providing Feedback

Overview

The TEP is a comprehensive overhaul of San Francisco’s transit network that will make Muni more efficient, reliable, safe, and comfortable for its 700,000 daily passengers. In conjunction with other Muni programs, the TEP is a blueprint for improving mobility for all residents while making Muni a great transportation choice for residents and visitors alike.  The TEP includes two categories of implementation tools to modernize Muni: 1) "Rapid" Proposals (or Travel Time Reduction Proposals), and 2) Network Service and Route Changes.  In addition, the TEP proposes to improve the customer experience by updating maps and investing in new signage to clearly communicate route information.  Some of the many improvements include:
- Better reliability and on-time performance - More user-friendly customer experiences
- Faster travel times - More accessible service
- Safer boardings on busiest routes - Better air quality and less congestion
- Shorter wait times  
 
The TEP primarily consists of "Rapid" proposals (or Travel Time Reduction Proposals), and Service and Route Changes.

The TEP includes Rapid Proposals for the following corridors:

- J Church: Balboa Park Station to Market
L TaravalWest Portal to SF Zoo
- N Judah: La Playa to Cole
- 5 Fulton: La Playa to Market
- 8X Bayshore Express: Geneva & Ocean to San Bruno & Silver
9 San Bruno: 11th & Market to Bayshore & Alemany
14/14L Mission/ Mission Limited: Daly City BART to Embarcadero
22 Fillmore: Church & 16th to 3rd & 16th
28/28L 19th Avenue/ 19th Avenue Limited: Junipero Serra to California
- 30 Stockton: Van Ness & Chestnut to Stockton & Market
- 71 Haight Noriega: Laguna to Stanyan
 
Note that approval and implementation of certain portions of the aforementioned corridors are being fast-tracked.  Specifically, there are seven segments within the Rapid Proposals that are proposed for fast-tracking for the purpose of coordinating with already-scheduled paving and other construction projects, which are anticipated for initiation between the Spring and Fall of 2014.
 
The seven fast-tracked TEP Rapid projects include the following segments:
 
- 30 Stockton: Columbus Avenue between Powell and Stockton
- 5 Fulton: Fulton Street between 46th and 25th Avenues
- 71 Haight Noriega: Haight Street between Fillmore and Lyon Streets
- N Judah: Irving Street between Arguello Boulevard and 9th Avenue
- N Judah: Judah Street at 28th Avenue
- 14/14L Mission/ Mission Limited: Mission Street at Silver Avenue
- 9 San Bruno: Potrero Avenue between Alameda and Cesar Chavez Streets

 

Revised Service and Route Change Proposals:

Based on feedback we recently received from members of the public, as well as from the SFMTA Policy and Governance Committee (PAG), which reviewed detailed proposals on March 21, we have revised the original proposals for service and route changes for the following routes: 2-Clement, 3-Jackson, 6-Parnassus8X-BayshoreExpress, 10-Townsend, 11-Downtown Connector,  12-Folsom, 17-Parkmerced22-Fillmore, 28 / 28L, 33-Stanyan, 35-Eureka, 43-Masonic, 47-Van Ness, and 48-Quintara 24th Street.

Service and Route Change Proposals Not Being Pursued:

Also based on recently-received public and PAG feedback, we will not be pursuing the initially-proposed service and route change for the following routes: 27-Bryant, 32-Roosevelt, 36-Teresita, 37-Corbett, and 56-Rutland.

Service and Route Change Proposals On Hold:

Additionally, based on public input and on further analysis, we will not be pursuing any route changes for the following routes at this time: 19-Polk, 48-Quintara 24th Street (east of Potrero Avenue), 58-24th Street, 23-Monterey, 54-Felton, and 90/91A/91B Owl.

 

Service and Route Changes are proposed for most Muni routes:

These are original proposals for route restructuring, frequency improvements, and vehicle type changes, which will direct resources to where they are needed most, reducing crowding and improving connections to regional transit.

- List of Proposed Service Changes by Route

Some of these service improvements require capital investment, such as new overhead wire or pedestrian improvements, to allow the bus to change routing, or to allow limited and local buses to run on the same street.

- List of Capital Projects Associated with Service Changes

TEP proposals are strategized based in part on recently-collected ridership and boarding statistics for each route.

- Table that Includes Ridership / Boarding Data

 

TEP Detailed Description

Background

The Transit Effectiveness Project is an on-going program that aims to improve service reliability, reduce travel time on transit, and improve customer experiences and service efficiency. As part of the Muni Rapid vision, and in conjunction with other Muni programs, the TEP will be the blueprint for making Muni a great transportation choice for our residents and visitors.

The TEP has been an on-going process since 2006. Two significant milestones include the presentation of the initial planning documents and findings in 2008 and the development of an Implementation Strategy in 2011.

From October 2006 to June 2007, the SFMTA captured a tremendous amount of information on its bus routes and rail lines, including exactly where customers are boarding vehicles and how many people are riding the system throughout the day (view this boarding data). The 2008 Planning Phase documents, which report the findings of this unprecedented route-by-route data collection effort, describe a new policy framework for Muni service, proposals for line-by-line route restructuring, and recommendations for internal operational improvements to reduce transit delay and improve system reliability.

The 2011 Implementation Strategy document outlines project priorities, funding needs and an implementation schedule. The Strategy identified $170 million in capital expenditures to continue our priority on reliability and improved travel time, as well as to implement the remaining route updates. Of the $170 million, approximately $90 million would go towards travel time reduction proposals and related customer amenities on the Rapid network. The remaining dollars would go towards terminal improvements, overhead wire expansion and other system-wide capital investments.

TEP Project Components

Service and Route Changes: The Transit Effectiveness Project (TEP) proposes service changes for route restructuring, frequency improvements, and vehicle type changes, which will direct resources where they are needed most. These changes will better serve Muni customers, reflect changing transit, and streamline routes for improved reliability and reduced delay. The proposed service and route changes include:

  • Creating new routes
  • Redesigning existing routes
  • Adding service to new streets
  • Eliminating unproductive existing routes or route segments
  • Changing vehicle type
  • Changing frequency and span of service
  • Changing the mix of local/limited/express service
  • Other changes, such as new express service stops, expansion of Limited-stop service to include Sundays, and the expansion of other service with the addition of days of operation.

See a list of proposed service changes by route.

Some of these service improvements require capital investment, such as new overhead wire or pedestrian improvements, to allow the bus to change routing, or to allow limited and local buses to run on the same street. Capital improvements needed for route restructuring include:

  • Overhead wire expansion to streets proposed for trolley service
  • Layover space expansion and pedestrian improvements to terminals and transfer points where routes are proposed to intersect
  • Road reconfiguration for a contraflow transit lane
  • Additional accessible rail platforms.

These capital improvements will be phased upon resource availability and are needed to complete the TEP proposed service changes. See a list of capital projects associated with service changes.

Rapid Proposals: Travel time reduction proposals along the Rapid Network, including bus stop and roadway changes, will help customers get to their destinations more quickly. For these proposals, there are no route changes proposed; these engineering changes are proposed specifically to address the delays vehicles face along their routes. The Rapid proposals are focused to optimize each operating dollar. By reducing travel time and improving reliability, there are opportunities to save operating dollars that can be reinvested. These proposals are based on ideas from outreach and best engineering practices for transit. They are not changes to route frequency or alignment.

Proposals are being evaluated for the following routes:

About the TEP Environmental Review Process:

The Planning Department is conducting an environmental review of the Transit Effectiveness Project (TEP) in compliance with the California Environmental Quality Act (CEQA). The environmental review process provides decision makers and the general public with an objective analysis of the immediate and long range specific and cumulative environmental impacts of a proposed project on its surrounding physical environment. In California, an environmental review is two-fold in purpose: to disclose the impacts of a project and to ensure public participation.

In January 2013, the Planning Department issued an Initial Study (IS) to focus the scope of the TEP Environmental Impact Report (EIR). The Initial Study is available for public review and by downloading from the Planning Department website. The public comment period for the TEP Initial Study was from January 24, 2013 through February 22, 2013.

The Planning Department issued a draft Environmental Impact Report (EIR) for the TEP on July 10th, 2013. The public comment period for the TEP Draft EIR was from July 11 to September 17, 2013.  The Planning Department will respond in writing to comments about the environmental review of the TEP proposals, including any information and analysis in the TEP Draft EIR.

To leave comments about all other TEP-related subjects and proposals, send an email to tep@sfmta.com or call the TEP hotline at 415-701-4599.

For more information about the environmental review process, please contact the Planning Department, Attention: TEP, 1650 Mission Street, Suite 400, San Francisco, California 94103, or email to debra.dwyer@sfgov.org.

 

Provide Feedback

Have any comments, questions, or general feedback about the TEP? Please let us know what you think:

  • Call 311 and provide your feedback.
  • Call the TEP Hotline at 415-701-4599.
  • Email comments to tep@sfmta.com.

 

 

Languages

TEP information may be found in Chinese and Spanish at:

Documents

AttachmentSize
PDF Making Connections Newsletter - Summer 20131.35 MB
PDF Potrero Streetscape Improvements Community Workshop Flyer81.71 KB
PDF Line_E_BW.pdf411.35 KB
PDF Line_F_BW.pdf680.32 KB
PDF Line_J_BW.pdf1.76 MB
PDF Line_KT_BW.pdf1.73 MB
PDF Line_L_BW.pdf1.35 MB
PDF Line_M_BW.pdf1.67 MB
PDF Line_N_BW.pdf1.15 MB
PDF Line_Nx_BW.pdf620.7 KB
PDF rte_001_BW.pdf833.7 KB
PDF rte_001AX_BW.pdf843.38 KB
PDF rte_001BX_BW.pdf732 KB
PDF rte_002_BW.pdf763.32 KB
PDF rte_003_BW.pdf420.18 KB
PDF rte_005_BW.pdf899.22 KB
PDF rte_006_BW.pdf1.14 MB
PDF rte_008AX_BW.pdf1.43 MB
PDF rte_008BX_BW.pdf1.57 MB
PDF rte_008X_BW.pdf1.58 MB
PDF rte_009_BW.pdf534.37 KB
PDF rte_010_BW.pdf816.68 KB
PDF rte_011_BW.pdf571.89 KB
PDF rte_012_BW.pdf788.8 KB
PDF rte_014_BW.pdf1.7 MB
PDF rte_014L_BW.pdf1.73 MB
PDF rte_014X_BW.pdf1.71 MB
PDF rte_016X_BW.pdf1.22 MB
PDF rte_017_BW.pdf509.72 KB
PDF rte_018_BW.pdf1.31 MB
PDF rte_019_BW.pdf1 MB
PDF rte_021_BW.pdf682.31 KB
PDF rte_022_BW.pdf933.16 KB
PDF rte_023_BW.pdf1.22 MB
PDF rte_024_BW.pdf1.11 MB
PDF rte_027_BW.pdf752.86 KB
PDF rte_028_BW.pdf1.85 MB
PDF rte_028L_BW.pdf652.28 KB
PDF rte_029_BW.pdf1.62 MB
PDF rte_030_BW.pdf528 KB
PDF rte_030X_BW.pdf457.01 KB
PDF rte_031_BW.pdf844 KB
PDF rte_031AX_BW.pdf852 KB
PDF rte_031BX_BW.pdf840 KB
PDF rte_032_BW.pdf465.19 KB
PDF rte_033_BW.pdf738.55 KB
PDF rte_035_BW.pdf319.99 KB
PDF rte_036_BW.pdf870.2 KB
PDF rte_037_BW.pdf476.21 KB
PDF rte_038_BW.pdf977.96 KB
PDF rte_038AX_BW.pdf824 KB
PDF rte_038BX_BW.pdf816 KB
PDF rte_038L_BW.pdf986.87 KB
PDF rte_039_BW.pdf247.13 KB
PDF rte_041_BW.pdf468.11 KB
PDF rte_043_BW.pdf1.53 MB
PDF rte_044_BW.pdf1.58 MB
PDF rte_045_BW.pdf618.95 KB
PDF rte_047_BW.pdf647.67 KB
PDF rte_048_BW.pdf1.34 MB
PDF rte_049_BW.pdf1.7 MB
PDF rte_052_BW.pdf325.86 KB
PDF rte_054_BW.pdf1.15 MB
PDF rte_056_BW.pdf340.94 KB
PDF rte_058_BW.pdf533.18 KB
PDF rte_066_BW.pdf501.16 KB
PDF rte_067_BW.pdf372.19 KB
PDF rte_071L_BW.pdf609.8 KB
PDF rte_076_BW.pdf611.32 KB
PDF rte_080X_BW.pdf262.96 KB
PDF rte_081X_BW.pdf260.48 KB
PDF rte_082X_BW.pdf360.65 KB
PDF rte_088_BW.pdf358.92 KB
PDF rte_090_BW.pdf1.61 MB
PDF rte_091A_BW.pdf1.57 MB
PDF rte_091B_BW.pdf1.56 MB
PDF rte_108_BW.pdf362.21 KB
PDF K_OnOff_1.pdf546.62 KB
PDF K_OnOff_1AX.pdf266.73 KB
PDF K_OnOff_1BX.pdf258.99 KB
PDF K_OnOff_2.pdf342.36 KB
PDF K_OnOff_3.pdf290.69 KB
PDF K_OnOff_5.pdf509.83 KB
PDF K_OnOff_6.pdf442.16 KB
PDF K_OnOff_8AX.pdf350.8 KB
PDF K_OnOff_8BX.pdf1.05 MB
PDF K_OnOff_8X.pdf610.53 KB
PDF K_OnOff_9.pdf514.06 KB
PDF K_OnOff_9L.pdf371.49 KB
PDF K_OnOff_10.pdf358.66 KB
PDF K_OnOff_12.pdf357.54 KB
PDF K_OnOff_14.pdf472.29 KB
PDF K_OnOff_14X.pdf389.04 KB
PDF K_OnOff_16X.pdf356.55 KB
PDF K_OnOff_17.pdf173.3 KB
PDF K_OnOff_18.pdf278.84 KB
PDF K_OnOff_19.pdf826.25 KB
PDF K_OnOff_21.pdf997.84 KB
PDF K_OnOff_22.pdf888.09 KB
PDF K_OnOff_23.pdf989.38 KB
PDF K_OnOff_24.pdf1.06 MB
PDF K_OnOff_27.pdf934.99 KB
PDF K_OnOff_28.pdf941.39 KB
PDF K_OnOff_28L.pdf720.4 KB
PDF K_OnOff_29.pdf1.05 MB
PDF K_OnOff_30.pdf892.38 KB
PDF K_OnOff_30X.pdf776.08 KB
PDF K_OnOff_31.pdf869.41 KB
PDF K_OnOff_31AX.pdf862.72 KB
PDF K_OnOff_31BX.pdf847.71 KB
PDF K_OnOff_33.pdf990.56 KB
PDF K_OnOff_35.pdf768.62 KB
PDF K_OnOff_36.pdf872.21 KB
PDF K_OnOff_37.pdf691.68 KB
PDF K_OnOff_38.pdf866.46 KB
PDF K_OnOff_38AX.pdf843.77 KB
PDF K_OnOff_38BX.pdf857.84 KB
PDF K_OnOff_38L.pdf855.01 KB
PDF K_OnOff_39.pdf439.75 KB
PDF K_OnOff_41.pdf773.92 KB
PDF K_OnOff_43.pdf945.46 KB
PDF K_OnOff_44.pdf1.06 MB
PDF K_OnOff_45.pdf950.78 KB
PDF K_OnOff_47.pdf882.29 KB
PDF K_OnOff_48.pdf994.19 KB
PDF K_OnOff_52.pdf867.38 KB
PDF K_OnOff_54.pdf1.03 MB
PDF K_OnOff_56.pdf573.53 KB
PDF K_OnOff_66.pdf539.96 KB
PDF K_OnOff_67.pdf675.65 KB
PDF K_OnOff_71_71L.pdf1021.36 KB
PDF K_OnOff_81X.pdf595.43 KB
PDF K_OnOff_82X.pdf644.5 KB
PDF K_OnOff_83X.pdf608.73 KB
PDF K_OnOff_88.pdf741.34 KB
PDF K_OnOff_90.pdf1.06 MB
PDF K_OnOff_91.pdf1.04 MB
PDF K_OnOff_108.pdf454.41 KB
PDF Line_CableCar_BW.pdf416.23 KB
PDF K_OnOff_14L.pdf442.89 KB
PDF Notice for TEP Public Informational Hearing.pdf169.35 KB
PDF PassengerActivity_ByTimePeriod_RT_1.pdf226.04 KB
PDF PassengerActivity_ByTimePeriod_RT_1AX.pdf41.82 KB
PDF PassengerActivity_ByTimePeriod_RT_1BX.pdf40.1 KB
PDF PassengerActivity_ByTimePeriod_RT_2.pdf227.61 KB
PDF PassengerActivity_ByTimePeriod_RT_3.pdf137.42 KB
PDF PassengerActivity_ByTimePeriod_RT_5.pdf217.89 KB
PDF PassengerActivity_ByTimePeriod_RT_6.pdf214.77 KB
PDF PassengerActivityTable_Route9.pdf264.78 KB
PDF PassengerActivityTable_Route10.pdf177.89 KB
PDF PassengerActivity_ByTimePeriod_RT_12.pdf225.43 KB
PDF PassengerActivity_ByTimePeriod_RT_14.pdf223.61 KB
PDF PassengerActivity_ByTimePeriod_RT_14L.pdf77.26 KB
PDF PassengerActivity_ByTimePeriod_RT_14X.pdf52.92 KB
PDF PassengerActivity_ByTimePeriod_RT_17.pdf142.17 KB
PDF PassengerActivity_ByTimePeriod_RT_18.pdf227.66 KB
PDF PassengerActivity_ByTimePeriod_RT_19.pdf300.03 KB
PDF PassengerActivity_ByTimePeriod_RT_21.pdf174.92 KB
PDF PassengerActivity_ByTimePeriod_RT_22.pdf207.73 KB
PDF PassengerActivity_ByTimePeriod_RT_23.pdf280.81 KB
PDF PassengerActivity_ByTimePeriod_RT_24.pdf126.92 KB
PDF PassengerActivity_ByTimePeriod_RT_27.pdf208.8 KB
PDF PassengerActivity_ByTimePeriod_RT_28.pdf172.62 KB
PDF PassengerActivity_ByTimePeriod_RT_28L.pdf79.78 KB
PDF PassengerActivity_ByTimePeriod_RT_29.pdf340.19 KB
PDF PassengerActivityTable_Route30.pdf190.23 KB
PDF PassengerActivity_ByTimePeriod_RT_30X.pdf64.64 KB
PDF PassengerActivity_ByTimePeriod_RT_31.pdf235.82 KB
PDF PassengerActivity_ByTimePeriod_RT_31AX.pdf48.84 KB
PDF PassengerActivity_ByTimePeriod_RT_31BX.pdf38.51 KB
PDF PassengerActivity_ByTimePeriod_RT_33.pdf199.97 KB
PDF PassengerActivity_ByTimePeriod_RT_35.pdf108.59 KB
PDF PassengerActivity_ByTimePeriod_RT_36.pdf229.54 KB
PDF PassengerActivity_ByTimePeriod_RT_37.pdf210.46 KB
PDF PassengerActivity_ByTimePeriod_RT_38.pdf235.22 KB
PDF PassengerActivity_ByTimePeriod_RT_38AX.pdf41.16 KB
PDF PassengerActivity_ByTimePeriod_RT_38BX.pdf39.28 KB
PDF PassengerActivity_ByTimePeriod_RT_38L.pdf91.38 KB
PDF PassengerActivity_ByTimePeriod_RT_39.pdf85.56 KB
PDF PassengerActivityTable_Route41.pdf123.04 KB
PDF PassengerActivity_ByTimePeriod_RT_43.pdf345.79 KB
PDF PassengerActivity_ByTimePeriod_RT_44.pdf266.85 KB
PDF PassengerActivityTable_Route45.pdf150.57 KB
PDF PassengerActivity_ByTimePeriod_RT_47.pdf160.02 KB
PDF PassengerActivity_ByTimePeriod_RT_48.pdf314.84 KB
PDF PassengerActivity_ByTimePeriod_RT_49.pdf219.75 KB
PDF PassengerActivity_ByTimePeriod_RT_52.pdf161.17 KB
PDF PassengerActivity_ByTimePeriod_RT_54.pdf321.63 KB
PDF PassengerActivity_ByTimePeriod_RT_56.pdf94.8 KB
PDF PassengerActivity_ByTimePeriod_RT_66.pdf137.53 KB
PDF PassengerActivity_ByTimePeriod_RT_67.pdf242.6 KB
PDF PassengerActivity_ByTimePeriod_RT_71.pdf244.64 KB
PDF PassengerActivity_ByTimePeriod_RT_71L.pdf97.44 KB
PDF PassengerActivity_ByTimePeriod_RT_80X.pdf18.3 KB
PDF PassengerActivity_ByTimePeriod_RT_81X.pdf18.11 KB
PDF PassengerActivity_ByTimePeriod_RT_88.pdf50.49 KB
PDF PassengerActivity_ByTimePeriod_RT_90.pdf83.54 KB
PDF PassengerActivity_ByTimePeriod_RT_91.pdf174.86 KB
PDF PassengerActivity_ByTimePeriod_RT_108.pdf85.71 KB
PDF Muni Needs Your Input Flyer1.43 MB
PDF TEP Implementation Plan - Section 1 (2).pdf1.8 MB
PDF Routes 2-3 - Revised Service Change Proposals1.35 MB
PDF Route 6 - Revised Service Change Proposals2.21 MB
PDF Route 8X - Revised Service Change Proposals2.99 MB
PDF Routes 17-18 - Revised Service Change Proposals2.46 MB
PDF Route 27 - Revised Service Change Proposals1.44 MB
PDF Route 35 - Revised Service Change Proposals757.96 KB
PDF rte_036_BW_EK_REVISED.pdf1.39 MB
PDF Route 56 - Revised Service Change Proposals646.82 KB
PDF 2 Clement Revised Service Change Proposal621.44 KB
PDF 3 Jackson Revised Service Change Proposal301.47 KB
PDF 6 Parnassus Revised Service Change Proposal449.28 KB
PDF 8X Bayshore Express Revised Service Change Proposal287.5 KB
PDF 12 Folsom Revised Service Change Proposal1.01 MB
PDF 17 Parkmerced Revised Service Change Proposal312.64 KB
PDF 22 Fillmore Revised Service Change Proposal444.03 KB
PDF 27 Bryant Revised Service Change Proposal1.01 MB
PDF 28/28L 19th Avenue Revised Service Change Proposal1.35 MB
PDF 29 Sunset Revised Service Change Proposal1.25 MB
PDF 33 Stanyan Revised Service Change Proposal444.03 KB
PDF 35 Eureka Revised Service Change Proposal335.11 KB
PDF 22 Fillmore Proposed Mission Bay Extension Map296.38 KB
PDF TEP Community Guide - Part 15.01 MB
PDF TEP Community Guide - Part 24.94 MB
PDF TEP Community Guide - Appendix1.81 MB
PDF OLD - TEP Implementation Plan Part 1 - Contents, TEP Plan, and Implementation Tools7.14 MB
PDF OLDTEP Implementation Plan Part 2 - Proposals by Route (Muni Ntwk, Legend, & Routes E, F, J, KT, L, M, N, NX, 1, 1AX, 1BX, 2, 3)7.53 MB
PDF OLD - TEP Implementation Plan Part 3 - Proposals by Route (Routes 5, 5L, 6, 8X, 8AX, 8BX, 9, 9L, 10, 11, 12)6.23 MB
PDF OLD - TEP Implementation Plan Part 4 - Proposals by Route (Routes 14, 14L, 14X, 16X, 17, 18, 19, 21, 22, 23, 24)7.75 MB
PDF OLD - TEP Implementation Plan Part 5 - Proposals by Route (Routes 27, 28, 28L, 29, 30, 31, 32)5.13 MB
PDF OLD TEP Implementation Plan Part 6 - Proposals by Route (Routes 33, 35, 36, 37, 38, 38L, 39, 41, 43, 44, 45, 47, 48, 49, 52, 54)7.9 MB
PDF OLD - TEP Implementation Plan Part 7 - Proposals by Route (Routes 56, 58, 66, 67, 71, 71L, 76, 80X, 81X, 82X, 88, 90, 91, 108)4.36 MB
PDF OLD - TEP Implementation Plan Part 8 - Appendix176.8 KB
PDF TEP Community Guide - Full Version5.98 MB
PDF Revised 6-Parnassus Map716.12 KB
PDF Revised 22 Fillmore Map102.97 KB
PDF Revised 48 Quintara 24th St Map768.64 KB
PDF Revised 47 Van Ness Map921.66 KB
PDF Revised 10 Townsend Map579.76 KB
PDF Revised 43 Masonic Map319.77 KB
PDF Revised 6 Parnassus Map - 3-24-14728.84 KB
PDF Revised 17 Map - 3-25-14541.16 KB
PDF TEP Implementation Plan Part 1 - Contents and TEP Plan2.37 MB
PDF TEP Implementation Plan Part 2 - Implementation Tools6.8 MB
PDF TEP Implementation Plan Part 3 - Proposals by Route (Muni Network, Legend, & Routes E, F, J, KT, L, M, N, NX, 1, 1AX, 1BX, 2, 3)7.59 MB
PDF TEP Implementation Plan Part 4 - Proposals by Route (Routes 5, 5L, 6, 8X, 8AX, 8BX, 9, 9L, 10, 11, 12)6.58 MB
PDF TEP Implementation Plan Part 5 - Proposals by Route (Routes 14, 14L, 14X, 16X, 17, 18, 19, 21, 22, 23, 24)7.79 MB
PDF TEP Implementation Plan Part 6 - Proposals by Route (Routes 27, 28, 28L, 29, 30, 31, 32)5.96 MB
PDF TEP Implementation Plan Part 7 - Proposals by Route (Routes 33, 35, 36, 37, 38, 38L, 39, 41, 43, 44, 45, 47)5.44 MB
PDF TEP Implementation Plan Part 8 - Proposals (Routes 48, 49, 52, 54, 56, 58, 66, 67, 71, 71L, 76, 80X, 81X, 82X, 88, 90, 91, 108)7.25 MB
PDF TEP Implementation Plan Part 9 - Appendix311.97 KB
PDF Svc & Rte Changes Outreach Summary-Part 1 (Tbl of Contents, Overview, Notification and Publicity, Gathering Input, & Next Steps)297.15 KB
PDF Svc & Rte Changes Outreach Summary-Part 2 (Appendix-Notification Materials, Comm Mtg Summaries, & Tellmuni.com Comment Summary)1.09 MB
PDF Svc & Rte Changes Outreach Summary-Part 3 (Appendix-Proposals Revised Based on Community Feedback)5.13 MB