FINAL UPDATE: Delay at Powell Station has cleared. IB/OB #subwaysvc resuming normal operations. (More: 31 in last 48 hours)

This page has older content

Please see Related Projects on this page for current project information. See Travel & Transit Updates for current travel updates. We are keeping this page as a record of SFMTA service and outreach.

SFMTA Resumes Construction of Mission Bay Loop

Service Affected
Bicycle
Driving

Dear Neighbors, Business Merchants and Muni Customers:

The Mission Bay Loop is a key component for San Francisco’s T-Third rail line and is critical to operating the T-Third Central Subway service plan.  The loop provides turn-around capabilities for the T-Third Street light rail line via a connection of trackway from Third Street to 18th Street, Illinois, and 19th Streets, which will allow the SFMTA to operate the necessary service levels needed to support current and planned growth within the eastern portion of San Francisco.  The loop will also allow trains to turn around for special events to accommodate high demand between Mission Bay and the Market Street Muni Metro Subway.

On September 14, 2014, the SFMTA awarded a contract to Mitchell Engineering to complete the Mission Bay Loop.  The project will consist of installation of new tracks on the block surrounded by Third, 18th, Illinois and 19th Streets by connecting to the existing tracks on 18th and 19th Streets.

A stay of construction by the California Court of appeal was recently lifted, and the SFMTA expects to resume construction with exploratory excavations along 18th and 19th Streets within the next three weeks.  Construction should be completed within seven to eight months.  The work may affect traffic during construction, including bicycle traffic.  Mitchell Engineering will clearly mark all work areas and flaggers will help to direct traffic.  Please plan for minor delays when driving or bicycling through this area.  Vehicular and pedestrian access to properties along the project site will be maintained.

If you have any questions or concerns about this project, please contact Adrienne Heim, Public Information Officer, 1 South Van Ness Avenue – 3rd Floor, San Francisco, CA 94103, (415) 701-5472, Adrienne.Heim@sfmta.com

You can also sign up to receive email updates through https://www.sfmta.com/projects-planning/projects/mission-bay-loop.

We appreciate your understanding and patience as we work to improve your Muni service.

311 Free language assistance / 免費語言協助 / Ayuda gratuita con el idioma / Бесплатная помощь переводчиков / Trợ giúp Thông dịch Miễn phí / Assistance linguistique gratuity / 無料の言語支援 / 무료 언어 지원 / Libreng tulong para sa wikang Tagalog / ควมช่วยเหลือทงภโดยไม่เสยค่าใช้จ่าย

For Muni route, schedule, fare and accessible services information anytime: Visit www.sfmta.com or contact 311

311: 中文 / Español / Français / 日本語 / 한국어 / русский / tiếng Việt / Tagalog / ไทย

Contact