Brotherhood-Alemany Quick-Build Project

Share this:
SFMTA.com/Brotherhood-Alemany

Community Site Visit

 

You’re invited to a community site walk on October 4th at 10 am to hear more about the needs of community members at this location. RSVP, or fill out a digital comment card if unable to attend.

歡迎您參加 10 月 4 日上午 10 點舉行的社區現場走訪活動,聽取更多關於該地點社區成員需求的資訊。請回覆是否參加 ;或若無法出席,您亦可填寫數位意見卡

Lo invitamos a un recorrido por el lugar donde se realizarán las obras el 4 de octubre a las 10 de la mañana, para conocer más acerca de las necesidades de los miembros de la comunidad en este lugar. Confirme la asistencia o complete una tarjeta digital de comentarios si no puede asistir.

Ikaw ay iniimbitahan sa isang paglalakad kasama ang komunidad sa Oktubre 4 sa ganap na 10 am upang mapakinggan pa ang tungkol sa mga pangangailangan ng mga miyembro ng komunidad sa lokasyong ito. Mangyaring sumagot kung makakadalo, o punan ang isang digital na card ng komento kung hindi makakadalo.


Graphic instructing attendees to meet at the corner of Brotherhood Way and Orizaba Ave

Présentation du projet (Project Introduction)

The Brotherhood-Alemany Quick-Build Project will make the complicated Brotherhood Way / Alemany Boulevard / Sagamore Street / Orizaba Avenue / Bright Street intersection more safe and easy to navigate for people walking, driving, taking transit and riding bikes.

The project will improve safety using proven methods that will:

  • Make drivers more likely to stop for pedestrians at crosswalks;
  • Lower vehicle speeding;
  • Reduce conflicts between turning and merging cars;
  • Make it easier for people to access their homes, churches, bus stops, and parks;
  • Improve connections for people riding bikes.

The project will involve reaching out directly to neighborhood groups and residents, and it will work closely with the SFCTA's Brotherhood Way Safety and Circulation Plan study.

Project Timeline
Summer-Fall 2025
Conceptual Design and Public Engagement
Completed
2025-2026
Project Approvals
Pending
2026
Implementation
Pending
2026-2027
Evaluation
Pending
Statut du Projet (Project Status)
  1. Planning

Project Background

The “Brotherhood-Alemany” intersection includes Brotherhood Way, Alemany Boulevard, Sagamore Street, Orizaba Avenue, and Bright Street, and it's a complicated spot in the southern part of San Francisco. The traffic from different directions is a mix of uncontrolled intersections, stop, yield, and signal-controlled traffic. Most pedestrian crossings don’t have signals, and crossing the main part of the intersection means crossing four lanes of cars. Some bike paths exist on nearby roads, but they don’t connect through the intersection. The 54-Felton bus route also passes through this area.

In 2023 and 2024, the SFMTA staff created some ideas for improving safety and traffic flow at the Brotherhood/Alemany intersection through the Brotherhood/Alemany Safety Improvement Project. During community discussions, community members strongly expressed the need for better safety measures, especially for pedestrians crossing the intersection. Because of this feedback, the Brotherhood/Alemany Quick-Build Project was started to make important changes quickly while planning for more long-term improvements.

 