
Dear Community Members,
The San Francisco Municipal Transportation Agency (SFMTA) invites you to a virtual public hearing to review proposed safety improvements as part of the Clarendon Quick Build Project.
Engineering Public Hearing Details
- Date: Friday, October 3, 2025
- Time: 10:00 AM
- Location: Virtual Meeting
- Project Website: SFMTA.com/ClarendonQB
Details on how to attend the meeting will be listed on the project website and the SFMTA Engineering Public Hearing website once the agenda is posted.
How to Submit Public Comment
You may participate online or via phone, or submit written comments by the end of the day of the public hearing:
- Email: Send comments to the project manager listed below with the subject line “Public Hearing.”
- Virtual Public Hearing: Friday, October 3, 2025, at 10:00 AM
- Online: Visit SFMTA.com/ENGHearing to view shared materials.
- Phone: Dial (415) 523-2709 and enter Conference ID: 836 632 456#
Project Overview & Key Benefits
The Clarendon Quick Build Project is designed to enhance pedestrian safety, calm vehicle turns, and improve visibility at key intersections. Proposed upgrades include:
- Road Diet: Right-sizing traffic lanes to one lane in each direction, matching the existing roadway on either end of the corridor.
- Daylighting at Crosswalks: Improving visibility by clearing sightlines near intersections.
- Concrete Islands:
- Improve compliance with daylighting and slow turning vehicles, increasing drivers’ ability to see pedestrians before they enter crosswalks.
- Olympia Drive near the firehouse: A new concrete island will replace the existing plastic flex posts and painted area. It will be designed to maintain fire truck access to the hydrant, solving the issue of regularly damaged posts while improving safety.
- Clarendon Woods Drive: A new concrete island on the eastern side of Clarendon Avenue and a continental crosswalk will improve visibility and pedestrian safety.
- Dellbrook Avenue: Two concrete islands—one on each side of Clarendon Avenue—will be added within daylighting zones to enhance visibility and calm turning vehicles
- Panorama Drive: Extension of the existing median island at Clarendon Avenue to calm turns near the school loading area
If you have any questions or comments, please reach out directly to the project manager:
Jacob.Henke@SFMTA.com
415-646-2409
☎ 415.646.4470: For free interpretation services, please submit your request 48 hours in advance of meeting. / Para servicios de interpretación gratuitos, por favor haga su petición 48 horas antes de la reunión. / 如果需要免費口語翻譯,請於會議之前48小時提出要求。 / Para sa libreng serbisyo sa interpretasyon, kailangan mag-request 48 oras bago ang miting. / Đối với dịch vụ thông dịch miễn phí, vui lòng gửi yêu cầu của bạn 48 giờ trước cuộc họp. / Для бесплатных услуг устного перевода просьба представить ваш запрос за 48 часов до начала собрания. / Pour les services d'interprétation gratuits, veuillez soumettre votre demande 48 heures avant la réunion. / 무료 통역 서비스를 원하시면 회의 48 시간 전에 귀하의 요청을 제출하십시오. / 無料通訳サービスをご希望の場合は、会議の48時間前までにリクエストを提出してください。