Search - site wide text search
Bayview Community Pathway: SFMTA Board of Directors and Public Hearing
SFO Overnight Construction at T3 - 2025.10.28
To: San Francisco Taxi Drivers On the night of Tuesday, October 28, 2025, the taxi stand at T3 will be shortened to a maximum of four (4) taxis at any time, between 12:00am and 8:00am. This is being...
Map of locations for Fall 2025/Winter 2026 installation
Post Incident Summaries - November 2025
Detailed accounts of recent major system delays of 30-minutes or longer. We apologize if you were inconvenienced by any of these delays and thank you for riding Muni. Incidents are posted on this page...
Proposed Design - Bayview Community Pathway
Hardly Strictly Bluegrass 2025
TO: San Francisco Taxi Drivers, Color Schemes and Medallion Holders FROM: Philip Cranna, Enforcement and Legal Affairs Manager, SFMTA Taxi Services Please note the Hardly Strictly Bluegrass event will...
Failed Inspection Fee Enforcement
TO: San Francisco Taxi Drivers and Color Schemes SFO Rules and Regulations include a fee of $134 for failing an inspection at GTU. While this has been a rule for a long time, SFO did not consistently...
Potrero Yard Modernization Project Working Group Meeting #50 Presentation
DRAFT Existing and Proposed Design
This document is a draft drawing showing the comparison of the existing road striping and the proposed road striping with concrete islands. Changes are noted with blue circle.
ASE Speed Safety Camera Location List Flyer (English)
ASE Speed Safety Camera Location List Flyer (English)
ASE Speed Safety Camera Location List Flyer (Chinese)
ASE Speed Safety Camera Location List Flyer (Chinese)
ASE Speed Safety Camera Location List Flyer (Russian)
ASE Speed Safety Camera Location List Flyer (Russian)
ASE Speed Safety Camera Location List Flyer (Filipino)
ASE Speed Safety Camera Location List Flyer (Filipino)
ASE Speed Safety Camera Location List Flyer (Spanish)
ASE Speed Safety Camera Location List Flyer (Spanish)