ATTN: OB 91 Owl will reroute around Union Square until further notice. OB 91 Owl Reroute: Via Sutter, Mason, Market, 4th to regular route. (More: 27 in last 24 hours)

Pedestrian Bridge Removal at Geary and Steiner Before/After Images

Friday, May 22, 2020

This page contains comparison images for the Pedestrian Bridge Removal at Geary and Steiner.

Steiner/Geary Intersection Before

Photo of Steiner Street crossing before the project

Existing Conditions:

  • Bridge crossing of Geary Boulevard
  • No street level foot crossing of Geary Boulevard on the east side of the intersection

Steiner/Geary Intersection After

Artist conception of Steiner/Geary intersection after project

New Features:

  • Bridge removed
  • Street-level crossing of Geary both east and west of intersection with refuge areas between traffic lanes.

Webster/Geary Intersection Before

Photo of view of Webster/Geary intersection before the project

Existing Conditions:

  • Bridge crossing of Geary Boulevard
  • No street level foot crossing of Geary Boulevard on either side of the intersection

Webster/Geary Intersection After

Artist concept of Webster/Geary intersection after project

New Features:

  • Bridge retained
  • Street-level crossing of Geary both east and west of intersection with refuge areas between traffic lanes.
  • The eastern crossing is east of the bridge, further from the intersection.