Potrero Yard Modernization Project Before/After Images

Tuesday, September 17, 2019

Bryant Street Before

Photo of Bryant Street before the project

Existing Conditions:

  • View into the bus yard
  • Inactive streets at Bryant  and 17th streets

Bryant Street After

Artist conception of view from Bryant after project

Proposed New Features:

  • Top of the bus facility (approximately 75 feet tall)
  • Bus facility wall treatment (i.e. views into bus facility, green wall, screening, and artwork)
  • Potential joint development lobby  
  • Programmed and active street (i.e commercial and retail uses)
  • Potential joint development above (above the approximately 75 feet of bus facility up to 150 feet maximum height. Final building land uses to be determined in future phases.)
  • Variation to the building's facade

Mariposa Street Before

Photo of view of Mariposa Street before the project

Existing Conditions:

  • Main bus access on Mariposa Street

Mariposa Street After

Artist concept of Mariposa Street after project

Proposed New Features:

  • Top of the bus facility (approximately 75 feet tall)
  • Potential joint development above (above the approximately 75 feet of bus facility up to 150 feet maximum height. Final building land uses to be determined in future phases.)
  • SFMTA operations and training Facility (final building land uses to be determined in future phases.)
  • Improved streetscape
  • Stepping back to respect neighborhood scale
  • Bus facility wall treatment (i.e. views into bus facility, green wall, screening, and artwork)