Van Ness Improvement Project Drawings
General Civil 1 of 2 Civil 2 of 2 Roadway 1 of 4 Roadway 2 of 4 Roadway 3 of 4 Roadway 4 of 4 Architecture Landscape Architecture 1 of 5 Landscape Architecture 2 of 5 Landscape Architecture 3 of 5...
General Civil 1 of 2 Civil 2 of 2 Roadway 1 of 4 Roadway 2 of 4 Roadway 3 of 4 Roadway 4 of 4 Architecture Landscape Architecture 1 of 5 Landscape Architecture 2 of 5 Landscape Architecture 3 of 5...
Thanks for your interest in the Alemany Corridor Safety Project. Utilizing the feedback we received from the December 2019 open house, as well the feedback received via email, our project team has...
Due to the COVID-19 health emergency and to protect our Board Members, SFMTA staff, and members of the public, the Board’s Meeting Room at One South Van Ness Avenue is closed. Members of the public...
To help complete necessary sewer work for the much-anticipated Unity Plaza development project, which began construction in December 2015, the City College Terminal Bus Loop will need to close on...
Watch a time-lapse video of the Steiner bridge being removed The pedestrian bridge at Geary Boulevard and Steiner Street was removed...
Bicycling moves people around San Francisco using less space per person than when people go by driving. The SFMTA encourages bicycling and makes yearly ridership and trend data public. While Bike-to...
Since the Mission / Geneva Safety Project was approved by the SFMTA Board of Directors in September 2019, the project team has been working to advance detailed design of the safety, transit, and curb...
We are very excited to be moving forward with the third phase Slow Streets, which will connect new and existing Slow Streets together into a network that allows most San Franciscans to be able to...
In 2017, the San Francisco Municipal Transportation Agency (SFMTA) launched the Building Progress Program , a $1.2 billion multi-year effort, to repair, renovate, and modernize the SFMTA’s aging...
The bus stop relocation for the stop located westbound on Geneva Avenue between I-280 and San Jose Avenue has been extended until Friday, July 29 to complete the sidewalk widening on the north side of...
This fall, temporary emergency transit lanes will be installed on 7th and 8th streets downtown. Click here to view the powerpoint that...
Reset to default view
Export image
Download displayed data in excel format
Download complete/accessible data for this metric
For questions, comments, and...