FINAL UPDATE: Southbound #TThird cleared at 3rd and 18th. Regular service resuming. Expect residual delays. (More: 19 in last 48 hours)

This page has older content

Please see Related Projects on this page for current project information. See Travel & Transit Updates for current travel updates. We are keeping this page as a record of SFMTA service and outreach.

L Taraval Improvement Project Work Forecast April 19 to April 23, 2021

Service Affected
Bicycle
Parking
Driving
Transit
Neighborhoods Affected
Details of Work Performed:
  • L Bus Serves regular stops: As we are wrapping up the major infrastructure improvements on Taraval Street, the L bus is now serving the regular stops between Sunset Boulevard and 46th Avenue. These improvements include replacements of the rail, water and sewer lines as well as street repaving. 
     
  • Streetscape and landscape work is taking place with minimum impact until this summer on Taravel:
  • Installing cobbles on trackway is planned for:
    • April 19-28 between 46th and 48th avenues
       
  • Installing crosswalk striping is planned for:
    • April 19-23 between 37th and 46th avenues
       
  • Calking track pavement is planned for:
    • April 19-23 between 48th Avenue and Sunset Boulevard
       
  • Installing paving stones and plants inside planters at boarding islands and accessible platforms is planned for:
    • April 19-23 between 40th and 43rd avenues
       
  • Painting overhead wire poles is planned for
    • April 19-28 and beyond along Taraval Street
What to Expect:

Excavation requires jackhammering of the pavement. Dust control measures will be in place to prevent dust kick up from the work.

Time of Work:
  • Monday to Friday 8:00 a.m to 5:00 p.m.; Saturday to Sunday 8:00 a.m to 5:00 p.m. Hours subject to change based on construction needs. 
Traffic Impacts:

Some parking will be temporarily restricted in construction zones and traffic lanes will be modified during active work.

Muni Impacts:

Since the Muni Metro service is being suspended due to COVID-19 pandemic, the L bus has been serving the L Taraval Line with occasional reroutes between Sunset Boulevard and 46th Avenue to accommodate construction work. Once rail service resumes, transit service on the L Taraval will remain throughout with a combination of buses and trains.



The above construction forecast is subject to change due to weather delays or unexpected field conditions.

Questions or concerns? Contact us at LTaravalProject@SFMTA.com or 415.701.4387

Stay Up To Date: For L Taraval Improvement Project work forecast and updates, please sign-up for email updates by visiting SFMTA.com/LTaravalProject.

☎ 311 (Outside SF 415.701.2311; TTY 415.701.2323) Free language assistance / 免費語言協助 / Ayuda gratis con el idioma / Бесплатная помощь переводчиков / Trợ giúp Thông dịch Miễn phí / Assistance linguistique gratuite / 無料の言語支援 / 무료 언어 지원 / Libreng tulong para sa wikang Filipino / การช่วยเหลือทางด้านภาษาโดยไม่เสียค่าใช้จ่าย / خط المساعدة المجاني على الرقم