HeadsUp: Protest/march activity is beginning on Market St. near Steuart. At this time, minor delays are expected in the area, but no reroutes are being implemented at this time. Personnel are on scene monitoring. Will update as more information becomes available. (More: 15 in last 48 hours)

This page has older content

Please see Related Projects on this page for current project information. We are keeping this page as a record of SFMTA outreach.

Geary Rapid Project Construction Forecast: August 8 - August 21, 2020

Service Affected
Accessibility
Taxi
Driving
Transit

Photo: Crews pour concrete for the foundation of a new streetlight pole at Geary and Steiner

Photo: Crews pour concrete for the foundation of a new streetlight pole at Geary and Steiner

As part of the Geary Rapid Project, work to replace aging water lines, in coordination with San Francisco Public Utilities Commission, continues. Surface transportation improvements, including upgraded traffic signals and streetlights, sidewalk extensions at bus stops and intersection corners, improved median refuges and roadway repaving, are also underway and are being managed by San Francisco Public Works. 

Geary Rapid Project construction is currently scheduled to continue during the shelter in place order, with crews observing social distancing requirements and a safe working environment. The following two-week construction forecast is subject to change due to weather delays or unexpected field conditions.

Stanyan Street – Franklin Street
Mondays through Fridays between 8:00 a.m. and 7:00 p.m.:

  • Water main connection and testing is planned for the weeks of August 10 and August 17 on Geary Boulevard from Laguna to Gough streets.
    • Water service to some properties may be briefly shut off while SFPUC connects to the new water main on Geary. SFPUC will notify properties in advance of any service interruption. To minimize disruption, work is sometimes conducted at night.
  • Concrete roadway base work is planned for the weeks of August 10 and August 17 on Geary Boulevard from Divisadero to Webster streets
  • Traffic signal and streetlight work is planned for the weeks of August 10 and August 17 at the intersections of Steiner Street and Fillmore Street.
  • Curb ramp and sidewalk extension work is planned for the weeks of August 10 and August 17 on Geary Boulevard at the intersections of Divisadero Street, Scott Street and Steiner Street.
    • During active roadway work, the inbound and outbound 38/38R bus stops between Divisadero and Scott streets will be temporarily relocated nearby. Look for “Board Here” signs.
  • Final curb-to-curb asphalt roadway repaving is planned on Monday, August 17 (grinding) and Tuesday, August 18 (paving) for both directions of Geary Boulevard from Scott to Steiner streets. There may be traffic delays while lanes are closed during work.
    • During paving in front of driveways, there will be a four-hour period with restricted vehicle access as the hot asphalt cools down. Affected properties will be notified in advance.
    • Similarly, the inbound and outbound 38 Geary bus stops at Scott will be temporarily relocated nearby briefly as the pavement cools. Look for “Board Here” signs.
  • Weekend work: Concrete roadway base work is planned for Saturday, August 8 at the Divisadero Street intersection. There may be traffic delays while lanes are closed during work.

 

Van Ness Avenue – Market Street
Mondays through Fridays between 7:00 a.m. and 4:00 p.m.:

  • Water main work is planned for the weeks of August 10 and August 17 on Geary Street between Polk and Jones streets (service connections) and between Taylor and Stockton streets (main pipe installation).
    • During active water work, the outbound 38/inbound 19 bus stop on Geary at Larkin will be temporarily relocated west towards Polk Street. Look for “Board Here” signs nearby.
    • Water service to some properties may be briefly shut off while SFPUC connects to the new water main on Geary. SFPUC will notify properties in advance of any service interruption. To minimize disruption, work is sometimes conducted at night.

Some parking will be temporarily restricted in construction zones and traffic lanes will be modified during active work. There may be brief vibrations during sidewalk and roadway excavation.

Questions or concerns? Contact us at GearyRapid@SFMTA.com or 415.646.2300.


Shop Local

You can do your part to help San Francisco's vibrant commercial life rebound from COVID-19 by visiting local businesses. Click below to see what's open in your neighborhood:

Support the Fillmore

Support Japantown

Support the Tenderloin

Support Union Square


Banner advertising permits for outdoor space for businesses

Banner advertising permits for outdoor space for businesses.

Small Business Support

The SFMTA brings your customers to you on Muni, keeps the streets moving and manages the curb space. We know small businesses have many questions right now and we’re here to help you find resources offered by the City and County of San Francisco.

Where do I find information on small business loans and grants?

Can I move my business outside?

How do I safely get back to business in the “new normal?”

More information about these and opportunities such as deferring business taxes and licensing fees, accessing free COVID-19 testing for essential employees and resources for self-employed individuals can be found at oewd.org/covid19


COVID-19 Muni Core Service Plan

The SFMTA has made some necessary service changes during the order to shelter in place. Core Service bus routes are operating daily from 5:00 a.m. to 10:00 p.m. A reduced Owl network is operating at an earlier start time, from 10:00 p.m. to 5:00 a.m.

Please a wear face covering and practice physical distancing when waiting for, boarding and riding Muni.

Visit SFMTA’s COVID-19 page for the latest service and citation information.


The following 38/38R bus stops are planned to be temporarily relocated. These changes are part of work that is unrelated to the Geary Rapid Project.

  • Mondays - Sundays, March 27 – August 30, all day:
    The inbound 38/38R Geary bus stop on O'Farrell Street at Van Ness Avenue will be temporarily relocated west towards Franklin Street while work related to the Van Ness Improvement Project is performed. 
  • Mondays – Fridays, July 31 – August 31, 8:00 A.M. – 4:00 P.M.:
    The inbound and outbound 38/38R Geary bus stops between 33rd and 42nd avenues will be temporarily relocated nearby during roadway work. 

View a list of temporary bus stop relocations citywide.


Sign up for Geary Rapid Project updates via email or text.