L Taraval Improvement Project Seg B Project Update and Forecast - June 13, 2022 - June 25, 2022

Service Affected
Accessibility
Bicycle
Motorcycle
Parking
Taxi
Driving
Transit
Walking
Route(s) Affected

Details of Work to be performed:

L Taraval Improvement Project Update and Forecast

for the weeks of June 11- June 25, 2022

Taraval Street - North

North side of Taraval between 37th to 26th avenues

6/1/22 – 6/17/22      Sewer line work from 30th to 29th avenues

6/17/22 – 6/21/22     Water line work 29th Ave. Intersection

6/20/22 – 6/30/22    Water line work from 29th to 28th avenues

7/1/22 – TBD             Water line work from 28th - 27th avenues (anticipated start)

7/1/22 – TBD             Water line work from 28th Ave. intersection (anticipated start)

TBD                             Potholing water work 36th to 32nd avenues

North side of Taraval St. between 26th to 18th avenues   

6/9/22 – 6/17/22      Water line work 25th to 24th avenues

6/17/22 – 7/1/22      Water line work 24th to 22nd avenues

East of 19th Ave.

5/5/22 –   6/3/22       Water line work by block from 15th to 19th avenues

5/16/22 – 6/8/22       Water line work at intersections of 15th, 16th, 17th and 18th avenues

6/13/22 - TBD             Water line work, backfill and shoring at 19th Ave. and Taraval St. (anticipated start)

Taraval Street - South

South side between 35th to 22nd avenues

4/29/22 – 6/3/22      Sewer work by block from 32nd to 35th avenues

6/3/22       TBD          Sewer line work back fill and remove shoring at 22nd Ave. and Taraval St.  (anticipated)

17th to 15th avenues

6/10/22 – 6/17/22    Sewer line work 17th Ave.

6/15/22 – 6/24/22    Sewer line work from 17th to 16th avenues

6/24/22 – 7/2/22      Sewer line work

15th Ave. between Taraval and Ulloa streets

6/10/22 - 6/16/22     Excavation and connection east and west side of 15th Ave.

Ulloa Street

North side from 15th Ave. to Forest Side Ave.

6/9/22- 6/13/22       Excavate, shore and connect on the north side of Ulloa St. between Forest Side Ave. to 15th Ave.

Overnight work overhead contact system (OCS)

7/18/22 – 8/12/22   Remove contact wire

                                    Ulloa St. between Forest Side and15th avenues

                                    15th Ave between Ulloa and Taraval streets

                                    Taraval St. between 15th and 35th avenues

Forecast

Excavate and connect new service on 15th Ave. from Taraval to Ulloa streets

Excavate and connect new service from Ulloa St. north side from 15th Ave to Forest Side Ave.

 

Temporary staging locations

4/28/22 – 6/15/22      35th Ave. west side from Taraval to Ulloa streets (extended)

                                       Staging area is approximately 74 ft. long and 10 ft. wide

4/29/22 – 6/27/22      37th Ave. east side from Santiago to Rivera streets (extended)

                                        Staging area is 250 ft. long and approximately 10 ft. wide

5/4/22 – 6/26/22        31st Ave. west side from Taraval to Santiago streets (extension anticipated)

                                       Staging area is approximately 80 ft. long and 10 ft. wide

5/8/22 – 6/6/22         36th Ave. west side from Taraval to Santiago streets

                                       Staging area is approximately 220 ft. long and 10 ft. wide

5/12/22 – 7/1/22       17th Ave. west side from Taraval to Santiago streets (extended)

                                        Staging area is 80 ft. long and approximately 10 ft. wide

5/12/22 – 6/10/22     33rd Ave. west side from Taraval to Santiago streets (extension anticipated)

                                        Staging area is approximately 80 ft. long and 10 ft. wide

6/8/22 – 7/7/22         24th Ave east side from Taraval to Santiago streets

                                        Staging area is approximately 90 ft. long and 20 ft. wide

6/8/22 – 7/7/22         25th Ave. east side from Taraval to Santiago streets

                                        Staging area is approximately 70 ft. long and 20 ft. wide

6/10/22 – 7/8/22        16th Ave. east side from Taraval to Ulloa streets

                                        Staging area is approximately 65ft. long and 10 ft. wide

6/13/22 – 7/11/22     29th Ave. west side from Taraval to Santiago streets

                                        Staging area is approximately 85 ft. long and 10 ft. wide

Muni Service

L Shuttle Bus               Provides service for the L Taraval line between Embarcadero Station and SF Zoo

L Taraval segment B construction has reached a phase where the rail tracks west of the intersection of Ulloa and Madrone streets have been taken offline to complete construction work.  Work needs to be performed during construction to facilitate the reconstruction of the water and sewer mains as well as replace the tracks and overhead lines.

July 9, 2022, anticipated service changes

In response to changing trip patterns and subway improvements. The L Bus will be shortened and will increase frequency between the San Francisco Zoo and West Portal Station with more subway reliability. After extensive repairs and maintenance, many L Bus riders are choosing to transfer to the subway at West Portal for a faster ride to downtown, allowing the SFMTA to shorten the L Bus route while increasing frequency and putting limited resources on other routes that are experiencing crowding.  Visit our blog with posted planned service changes.

What to Expect:

New sewer and water lines

  • During excavation and installation, some driveways may be temporarily inaccessible
  • Excavation requires jackhammering of the pavement. Dust control measures will be in place to prevent dust kick up from the work
  • Heavy vibrations from the shoring and sheet piling work is expected for open trench work

Vehicle traffic

  • Temporary lane closures east of intersections where work will be performed

Ulloa St. north side from 15th Ave. and Funston Ave.

East and west side of 15th Ave. between Taraval and Ulloa streets

  • Posted no parking signs for the duration of work
  • Access may be delayed accessing residence, crew will allow safe access during construction
  • Sidewalk open for trenchwork

Temporary staging and construction areas

  • Posting of no parking signs along the staging areas
  • Posting of no parking signs in active construction areas

OCS work

  • Construction hours 10 pm – 5 am
  • Traffic delays
  • Parking restrictions
  • Traffic rerouting
  • Noise from back up alerts
  • Work will be performed sequentially along the L Taraval line from West Portal to Sunset Blvd.

Time of Work:

Monday through Friday, from 8 a.m. to 5 p.m.

No weekend work

Night Work

July 18 – August 12, 2022 10:00 p.m. – 5:00 a.m. anticipated

Traffic Impacts:

  • Some parking will be temporarily restricted in construction zones
  • Traffic lanes will be modified during active work
  • There will be dedicated flagger(s) to direct traffic and pedestrians
  • Temporarily close lanes at intersections with detours

Impacts from outside projects

Public Works                           19th Ave.

Public Utilities Commission   Vicente St., from Wawona St. to 34th Ave.

(PUC)                                       Wawona St., 15th Ave., and on Vicente St. west of 19th Ave.

PGE

Gas line work                      

Taraval St. and 19th Ave., intersection TBD

Intersections of 16th, 17th avenues intersection TBD

Taraval St. and 30th – 6/13/22 – 7/1/2022

Taraval St. and 33rd and 36th avenues TBD

                                   

Anticipated – subject to change

TBD - planned

Weekend Work

None planned