Third Street Bridge Bikeway Connection

Project Introduction

The Third Street Bridge quick-build will create a two-way bikeway connection between the Promenade/King St and Terry Francois Blvd to the south across the Lefty O’Doul (3rd St) Bridge. The protected bikeway will provide dedicated space for bicyclists and reduce the risk of conflicts with vehicles. When completed, the Third Street Bridge Bikeway Connection will close a critical gap in our bike network by connecting the existing protected two-way bikeway on Terry Francois Boulevard to the San Francisco Bay Trail.

Third Street Bridge

Vision Zero SF logo
Project Status
Completed
Streets
3rd Street