FINAL UPDATE: Delay at 3rd and 25th has cleared. IB/OB #TThird resuming service. https://t.co/BSpuDNUMKL (More: 19 in last 48 hours)

Third Street Bridge Bikeway Connection

SFMTA.com/3rdStreetBridge
Project Introduction

In July 2020, the SFMTA completed a two-way bikeway connection between the Promenade/Berry St. and Terry Francois Blvd. to the south across the Lefty O’Doul (3rd St) Bridge as part of the Third Street Bridge quick-build project. The protected bikeway provides dedicated space for bicyclists and reduce the risk of conflicts with vehicles. The Third Street Bridge Bikeway Connection closes a critical gap in our bike network by connecting the existing protected two-way bikeway on Terry Francois Boulevard to the San Francisco Bay Trail.

Vision Zero SF logo
Project Status
Completed
Streets
3rd Street
Contact Information